Thai Binh Thermal Power Plant Project

10:50, 29/12/2016

1. General

Name of project:

Thai Binh Thermal Power Plant

Investor :

Vietnam Electricity/Power Generation Corporation 1 

Project manager:

Thai Binh Thermal Power Project Management Board

Project location:

My Loc Commune, Thai Thuy District, Thai Binh Province

Total investment:

 VND 26,500 billion 

Investment sources:

ODA (85%), EVN’s reciprocal capital (15%)

Project scale:

600MW

Number of units:

02 x 300MW

Annual Output:

52 million kWh

Thai Binh Thermal Power Plant use conventional condensing technology with Subcritical pressure boilers, which has been a widely applied worldwide. The modern powerhouse technology meet strict demands for environmental protection after Vietnamese and international criteria.

Power will be dispatched to the national grid through a 220kV double circuit transmission line from Thai Binh power center to 220kV Thai Binh Substation. After its operation the project will increase power supply capacity for socio-economic development of Hong River delta. The project will also help to reduce grid dependency to hydropower source, especially in dry seasons and dry years, and increase safety, stability, and economics of grid operation.

2. Schedule

  • Ground breaking ceremony: 23 April 2016
  • Commercial operation of Unit No.1: 4th Quarter 2017
  • Commercial operation of Unit No.2: 2nd Quarter 2018


Share