The transmission capacity of grid 175 from Ba Che 220kV substation - Thieu Yen substation has been increased
The total investment in this project is more than VND 93 billion with the scale of newly constructing more than 22km of 110kV double-circuit transmission grid, going along with the existing grid; replacing equipment and parts for Ba Che 220kV substation (Thieu Hoa district) and Thieu Yen 110kV substation (Yen Dinh district).
After being put into operation, the work contributes to improving the transmission capacity of safe and stable power supply for the mountainous area in the West of Thanh Hoa province; helping create flexibility in operation, reducing power outages caused by incidents; complying with the power development planning of Thanh Hoa province in the period of 2016-2025 with consideration toward 2035.