EVNGENCO 1 leading in the block of power generation corporations in 2020

On 15 January, in Hanoi, giving the keynote speech at the conference of reviewing performance in 2020, implementing tasks for 2021 by Power Generation Corporation 1 (EVNGENCO1), EVN General Director Tran Dinh Nhan praised the unit for its successful completion of the tasks in 2020, being the leading unit in the power generation corporations (GENCOs).

EVN General Director Tran Dinh Nhan giving keynote speech 

The total amount of power produced by EVNGENCO in the past year was 36.8 billion kWh, reaching 96% of the plan assigned by EVN. This output accounts for 26.5% of the power produced by the Group and GENCOs; accounting for 15.2% of the power produced and purchased by the entire national power  system.

In the period of 2016 - 2020, power production in 2020 will grow by 55.95% compared to that of 2016. The total power production of EVNGENCO 1 for the whole period is 158.4 billion kWh; making an important contribution to meeting the power supply demand for the country's socio-economic development., 

Chairman of the Member Board of EVNGENCO 1 Nguyen Tien Khoa (left) and General Director of EVNGENCO 1 Nguyen Huu Thinh chairing the conference
 
Of which, Duyen Hai 3 Thermal Power Plant (Thermal Power Plant) has high availability in power supply, produced 8.8 billion kWh, reaching 103.87% of the plan. This plant is already operating at maximum capacity (Tmax), reaching 7,116 hours in 2020.

Along with that, EVNGENCO 1 strives to well implement environmental protection; The rate of ash and slag consumption of thermal power plants is higher than that in previous years, preventing the stagnation of ash and slag, affecting production and operation at the plants.

 General Director of EVN Tran Dinh Nhan was authorized to award the Third Class Labour Medal to collectives and individuals of EVNGENCO 1


In 2020, EVNGENCO 1 produces profitable business activities (surpassing the target assigned by the Group), conserving and developing capital, fulfilling all obligations to the State, and ensuring the lives of employees. In construction and investment activities, EVNGENCO 1 has overfulfilled important milestones of power source projects, in which, the expanded Duyen Hai 3 thermal power plant has been accepted and put into operation; being completed ahead of the progress of opening water tunnel of Da Nhim hydropower plant expansion project, and so on.

Deputy General Director of EVN Nguyen Tai Anh was authorized to award EVN Emulation Flag to the excellent emulation units of EVNGENCO1

Some business targets and indicators in 2021 of EVNGENCO 1:

- Plan for power production: 39,749 million kWh (including expended Duyen Hai 3 thermal power plant)

- Ensuring stable and reliable operation criteria; indicators to improve production efficiency.

- Participate in the wholesale electricity market with effective competion, improving the competitiveness of the Corporation through reducing electricity production costs.

- Complete the major overhaul plan.

- Perform construction investment with the expected value of VND 10,430 billion.


  • 15/01/2021 02:30
  • evn.com.vn
  • 721