Transformer AT2 220/110/22 kV - 250 MVA at Tay Ninh 2 220 kV substation
Before that, on November 11, 2020, SPMB energized transformer AT1.
The project is located in Bau Don commune, Go Dau district, Tay Ninh province, consisting of the construction of the substation and installation of two transformers 220/110/22 kV - 250 MVA; 07 feeders on the 220kV side; 10 feeders on the 110kV side.
Along with that, SPMB has built two new double-circuit 220 kV transmission lines with a total length of 432 m to connect Tay Ninh 2 220 kV substation to the existing Trang Bang - Tay Ninh 220 kV transmission line.
The project is invested by the National Power Transmission Corporation (EVNNPT), SPMB is the project management and implementation unit, Power Engineering Consulting Joint Stock Company 3 is the design consultant, and the Power Transmission Company 4 is the operator.
The project aims to ensure the power supply to Tay Ninh province's loads in order to meet the local socio-economic development needs of the region, and supplying electricity to Phuoc Dong - Boi Loi industrial zone. Especially, the project helps to evacuate electricity generated by renewable energy stations in the region.